Working outline:
Lechlade
|
1. Trail head: Oxford, June 2020
- Thames launch: Lechlade, farther up the Thames and to the west towards the Cotswolds.
- Route to London: Lechlade to Oxford, to Reading, to Windsor, to Kingston(Wimbledon).
The Teddington Locks are designated as the top of the tidal Thames.
From that point onwards, towards the sea, the river's banks will be effected by the rising and lowering of the tides. That will mean either mud or fortified walls will replace the natural river banks. And, a tide chart will be necessary to take advantage of the current.
There are a number of kayak clubs that serve this part of the Thames and I will definitely pre arrange some interaction with them. As well as having experience with the river, I bet they know where the best pubs are.
From that point onwards, towards the sea, the river's banks will be effected by the rising and lowering of the tides. That will mean either mud or fortified walls will replace the natural river banks. And, a tide chart will be necessary to take advantage of the current.
There are a number of kayak clubs that serve this part of the Thames and I will definitely pre arrange some interaction with them. As well as having experience with the river, I bet they know where the best pubs are.
